[edit] Performance and benchmarking
The performance of an asset over its anticipated lifespan takes into consideration not only the initial capital cost of a built asset but also the operational, maintenance, repair, upgrade and eventual disposal costs of the asset.
The phrase has been recently highlighted with the release of the Construction Sector Deal on Thursday 5th July 2018. One of the milestones of this project is to ensure that a common approach to procuring for whole-life asset value is developed by 2020 along with cost and performance benchmarks for built assets.
A lot of people in the industry have been ahead of the curve on this, for example, BSRIA was working on cost benchmarking for the installation of building services before the turn of the millennium in conjunction with a short-lived Government Department of the Environment, Transport and the Regions (DETR 97-01).
One of the recommendations of that guide: BSRIA AG 20-1/99, was that “tenders should be evaluated on whole-life costs rather than capital costs alone. This is best practice but often tenders are evaluated/awarded as directed by the client to suit his/her objectives and available funds – sometimes without regard to the ultimate long-term economies.”
[edit] Embracing the circular economy
As the circular economy becomes a more common term in the construction industry, the UK and the rest of the world are finding themselves moving into one of the greatest industrial opportunities of our time: the move to cleaner, greener and more sustainable economic growth. The focus on Whole Life Asset Performance in the built environment is shifting the emphasis from the costs of construction to a more cradle-to-grave approach: considering the costs of a building across its life cycle.
In our own lives, we find no difficulty in balancing a higher capital investment with a reduced operating cost or a higher residual value: these are the judgments we make when justifying the purchase of low-energy lamps, loft insulation or a new car with a higher resale value or greater fuel efficiency. Why then should organisations find it so difficult to move away from the ‘quick win mentality’ and apply the same rational approach to their investments in buildings and plant?
An example of where this has been embraced is the PFI schemes, where whole-life costs are crucial to the profitability of the scheme. In these circumstances, capital cost is recognised as a small subset of the whole-life costs, as the entity responsible for the build is also responsible for the running/maintenance of the site. Life cycle costing (LCC) is also well founded as a process for establishing the economic pillar of sustainability in BREEAM environmental assessments, BIM level 2 and general good stewardship.
On existing sites, BSRIA has often been called in to provide independent condition reports (sometimes used as dilapidation surveys), to support change in ownership and/or occupancy as well as when new maintenance contracts are being awarded. With a completed condition survey, and an understanding of the business under study, we are able to offer our Buildings Focused Maintenance (BFM) as an alternative to maintenance standard SFG20’s generic frequencies.
BFM runs a maintenance programme in line with business needs by aligning all activities with the criticality of the service being provided. This approach offers the potential for improved whole-life asset performance even on existing installations.
With a more forward-looking approach to construction, it is important to recognise the FM’s knowledge maximises its value over the long term. Early involvement of FM know-how increases the potential to add value from the start of the project.
Whole-life asset performance can be maximised by ensuring the design process meets the user’s needs and this is the expertise that the FM brings. FMs can be used to increase the value of assets over the long term by increasing efficiency, reducing maintenance costs and thereby increasing profits, while at the same time improving the facilities and the availability of the assets.
This article was written by Nick Blake, Principal Consultant (Facilities Management) at BSRIA. It first appeared on the BSRIA website in December 2018 and can be seen here.
--BSRIA
[edit] Related articles on Designing Buildings Wiki
- Asset information model.
- BIM.
- BIM articles.
- BIM standards.
- BIM resources.
- BS 1192:2007.
- BS 1192-4:2014.
- BS ISO 55000:2014 Asset management. Overview, principles and terminology.
- BS 8536-1:2015 Briefing for design and construction. Code of practice for facilities management (Buildings infrastructure).
- PAS 1192-2.
- PAS 1192-3
- PAS 1192-5:2015 Specification for security-minded building information modelling, digital built environments and smart asset management.
Featured articles and news
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.